Decorative Plaster
White cement based, one compound mineral textured decorative coating mortar which contains polymer additives and applied with trowel.
ADVANTAGES
Easy application, excellent adhesion, the application provides a decorative appearance. Thermal insulation system applications, wavy appearance can be corrected. Water and frost resistant. Structure resistant to external influences and protects many years. Exterior paints can be apply on it.
TECHNİCAL DATA
Powder color: White
Water mixing ratio: 7-8 lt. water/25kg. dust
Resting: 2-3 minutes
Pot life: Approximately 1-1,5 hours
Application temperature: +5 oC to +35 oC
Consumption: Approximately 3- 3,5 kg/m2
SURFACE PREPARATİON
Application of surface dust, oil must be cleaned of such substances preventing adhesion. UKS devorative plaster primer is applied with a brush or roller before application.
PREPARATİON AND IMPLEMENTATİON OF FEES
25 kg. decorative plaster TECHNO WORLD approximately 7 to 8 liters. Preferably as part of clean water into the soil with a low spped mixer or property not to be mixed. Mortars prepared 4-5 minute wait. Ripemin is ready to use mortar mixing again. Mortars prepared from 1 to 1,5 hours should be consumed.
APPLİCATİON INFORMATİON
Material should be applied to the surface with steel trowel and spread evely to all surfaces should be thick. Application thickness should be adjusted according to the largest aggregate. The latest within 10 minutes, plactic materials, while still wet plaster with a trowel in a circular motion to fill the winnig desing. After the application of high temperature up to the surface area of the cement plug moisten.
THOSE THAT SHOULD BE CONSİDERED
The outside temperature must be over +5 oC and below +35oC. If posible maket he applicaiton continuously without break. For breaks divide the surface to areas 20 sqm parts. Plactic trowel to apply the latest within 10 minutes through the film formed on the plaster, do not let it. Frozen within 24 hours, the risk of freezing or direct sun and wind, avoid open areas from the application. Field after application until the cement plug (approximately 1 week) or heavy snow be careful but no to cold. Using time spent in the past certainly should not be applied in horizontal surface area of the rain. Packing 25 kg paper bags, shelf life in humid environments and in unopened packages with 8 layers stacked on pallets can be stored fors ix mounths.
CLEANİNG THE EQUİPMENT
With water, just after application
DİSPOSAL
Dispose of empty packaging according to local
Regulations or recycle. Collect waste material, allow to dry out and harden and then dispose as construction waste.