Heat Insulation Board Adhesive
Polymer modified, cement based adhesive mortar for thermal and sound insulation boards
APPLICATION AREAS
Used indoors and outdoors for bonding EPS, XPS boards and rockwool.
PRODUCT BENEFITS
Do not effected from water. Bricks, gas concrete, precast panels, etc. Provides very good bonding.
Can be used in interior and exterior, vertical, horizantal, and is suitable for ceilling applications. Do not affected by temperature changes. Resistant to water and frost.
TECHNICAL DATA
Powder Color: Gray
Pack: 25kg craft bags
Aplication Temperature: Minimum surface temperature +5 oC / + 35 oC
Pot Life: 60-90 minutes
Consumption: Depending on surface conditions, 3-5 kg / m2 powder.
SURFACE PREPARATION
Application to be made of loose soil, oil must be clean and free of other chemicals. Concrete, cement, plaster and dry period we have completed the Premium should be. Absorbing excess heat in the floor, or if the application is made should be hydration.
PREPARATION AND APPLICATION INFORMATIONS
TECHNO WORLD 6-7lt (air temperature may vary depending on variables) into a clean and cool mixture of water (25 kg) and low-speed powder poured into the appropriate lump-free homogenous mixture in a blender with 3-4 minutes and 50-10 minutes will be provided. Maturing material is re-mixed ready to use. Application temperature +5 to +35 oC is recommended. Prepared materials, sheet and throughout all edges of the rear surface of the central part is placed into the points. Signs will be posted to the surface are suppressed, or rubber mallet on the tree with the help of tapping into the square and glue are sitting is provided. After sufficient curing adhesives, with the help of anchor plates fixed to the surface.
THOSE THAT SHOULD BE CONSIDERED
Prepared materials should be used in approximately three hours. Plate is being placed on the surface layer of mortar to create a film to prevent drying. Bellow +5 oC. do not apply. High-rise applications and windy areas should be done early in the process of mechanical anchors.
CLENING THE EQUIPMENT
With water, just after application
DISPOSAL
Dispose of empty pacaging according to local regulations or recycle. Collect waste material, allow to dry out and harden and then dispose as Construction Waste.
STORAGE
Shelf life – 6 months. Cool and dry place products on top of the pile should be provided to set up 8 sacks.